HALCYON P-17 Well Integrity Decision Workbench

UK North Sea | Gas-Lifted Oil Producer | Benchmark Assessment: 21 September 2026
STATUS: AMBER
Restriction IR-P17-2026-04 Active
1. Context & Detect
2. Validate & Compare
3. Interpret & Hypothesise
4. Assess Scenarios
5. Decide & Act
CONTEXT
VALIDATE
DETECT
COMPARE
INTERPRET
HYPOTHESISE
ASSESS
DECIDE
ACT
Active Integrity Restriction: IR-P17-2026-04 No production increase above 03 September baseline without Well Integrity Engineer approval. Target gas lift ≤ 4.3 MMscf/d. B-annulus to be recorded every 6h. Any B ≥ 40 barg or rebuild > 25 barg/24h requires immediate escalation.
Source: IR-P17-2026-04 E008
4,844
Oil Rate (bopd)
29.6
B-Annulus (barg)
108.0
A-Annulus (barg)
0.3
C-Annulus (barg)

Well Configuration & Completion

  • Environment: UK North Sea, fixed offshore platform
  • Function: Oil producer, mature depletion drive
  • Artificial Lift: Gas lift through A-annulus (4.2 MMscf/d)
  • Tubing: 4.5 in production tubing, packer ~2,700 m MD
  • Casing: 9 5/8 in production, 13 3/8 in intermediate
  • Barriers: SCSSV (passing but degrading trend), Tree valves (passing)
Source: HALCYON_P17_ENGINEERING_BASIS COMPLETION_AND_BARRIERS

Core Integrity Concern

Since 2022, B-annulus has changed from negligible pressure to repeatable sustained pressure with measurable rebuild after bleed-down. Behaviour accelerated during 2026.

  • Hydrocarbon indication in prior annulus sample (inconclusive source).
  • Correlation with higher A-annulus/gas-lift pressure.
  • Deteriorating but still passing SCSSV leak-test trend.
  • Overdue integrity surveillance (fingerprint sample).
  • Data-quality conflicts (gauge vs transmitter).
Source: INTEGRITY_AND_OPERATING_HISTORY E002 DQ06
CONTEXT
VALIDATE
DETECT
COMPARE
INTERPRET
HYPOTHESISE
ASSESS
DECIDE
ACT

B-Annulus Pressure History (2019–2026)

Note: MAASP reduced from 85 barg (REV2, superseded) to 70 barg (REV4, current) on 01 July 2026. WI-ENV-P17-REV4

Recent Hourly Pressures (Aug–Sept 2026)

SCSSV Leak Test Trend

Degradation Trend Detected Leak rate increased from 0.12 to 0.44 L/min. Still passes acceptance (≤ 0.50 L/min), but reliability of subsurface isolation barrier is reducing.
Source: valve_test_history E007

Data Quality & Overdue Surveillance

IDIssueSeverityImpact

Shift Log & Event Extract

DateRoleComment
CONTEXT
VALIDATE
DETECT
COMPARE
INTERPRET
HYPOTHESISE
ASSESS
DECIDE
ACT

Configuration Control: Current vs Superseded Limits

ParameterWI-ENV-P17-REV4 (Current)WI-ENV-P17-REV2 (Superseded)Decision Rule
B-annulus MAASP70 barg85 bargUse REV4 REV2 superseded 01 July 2026
B-annulus Action Level≥ 40 barg OR rebuild > 25 barg/24hN/AImmediate escalation & restriction
B-annulus Warning Level≥ 15 barg sustained OR rebuild > 10 barg/48hN/AEnhanced surveillance & review
Source: document_register E006

Current Compliance Status

ParameterCurrent ValueWarningActionMAASPStatus
B-annulus Pressure~29.6 barg≥ 15 barg≥ 40 barg70 barg WARNING
B-annulus Rebuild Rate~16 barg/36h (Sept 5 test)> 10 barg/48h> 25 barg/24hN/A WARNING
A-annulus Pressure~108 barg> 120 barg> 140 barg165 barg NORMAL
C-annulus Pressure~0.3 barg> 3 barg> 10 barg30 barg NORMAL
Surveillance ComplianceFingerprint overdueQuarterly requiredN/AN/A NON-COMPLIANT
Source: OPERATING_LIMITS_AND_MAASP bleed_rebuild_tests DQ06
CONTEXT
VALIDATE
DETECT
COMPARE
INTERPRET
HYPOTHESISE
ASSESS
DECIDE
ACT
Multi-Hypothesis Engineering Approach The benchmark does not provide a single proved leak path. The following hypotheses are ranked by plausibility based on current evidence. Confidence will change as missing evidence (e.g., fingerprint sample) is obtained.
CONTEXT
VALIDATE
DETECT
COMPARE
INTERPRET
HYPOTHESISE
ASSESS
DECIDE
ACT

Scenario Analysis & What-If Testing

Select a scenario to evaluate its impact on evidence, uncertainty, integrity constraints, and the operational decision.

Scenario: Increase Production / Choke (+10%)

Effect on Evidence & Uncertainty:

Would increase THP and flowline pressure. May increase gas lift demand (A-annulus). If leak path is rate-dependent (FM-02/03), B-annulus rebuild will accelerate, providing diagnostic evidence. If stable, weakens rate-dependent hypotheses. Currently uncertain due to overdue fingerprint.

Integrity Constraints & Decision:

BLOCKED Violates IR-P17-2026-04. Cannot approve until B-annulus source is identified and gauge disagreement resolved. Production opportunity does not override unresolved integrity constraints.

Source: IR-P17-2026-04 E014 OPERATING_INTENT

Scenario: Increase Gas Lift Rate

Effect on Evidence & Uncertainty:

Increases A-annulus pressure. If FM-01 (A/B seal leak) is active, higher A pressure will drive more gas into B-annulus, accelerating B-annulus buildup. This would be a useful diagnostic step test but carries risk of approaching Action levels.

Integrity Constraints & Decision:

BLOCKED Restriction limits gas lift to ≤ 4.3 MMscf/d. Current rate is 4.2 MMscf/d. Cannot increase without WI approval.

Source: IR-P17-2026-04 FM-01

Scenario: Reduce Production Rate

Effect on Evidence & Uncertainty:

Reduces THP and flowline pressure. Event E012 (Sept 12) showed that reducing rate slowed B-annulus rebuild but did not eliminate it. This suggests the leak/source is not purely rate-dependent, or there is a trapped pressure component.

Integrity Constraints & Decision:

VALID DIAGNOSTIC Already performed. Confirms that rate reduction alone will not resolve the B-annulus anomaly. Integrity investigation still required. Does not change current restriction status.

Source: E012 shift_log_extract

Scenario: Shut-In Well

Effect on Evidence & Uncertainty:

Stops production, reduces THP. B-annulus may stabilize if source is production-dependent. However, shut-in does NOT repair a leaking barrier. Trapped pressure or thermal effects might still cause B-annulus rise. C-annulus would be monitored for cross-contamination.

Integrity Constraints & Decision:

NOT REQUIRED YET B-annulus is ~29.6 barg, well below MAASP (70 barg) and Action level (40 barg). Shut-in is a last resort if barriers degrade further or limits are approached. Current disposition allows continued flowing under restriction.

Source: OPERATING_LIMITS_AND_MAASP WELL_FAILURE_MODEL

Scenario: Controlled B-annulus Bleed & Rebuild

Effect on Evidence & Uncertainty:

Confirms active leak/source and measures rebuild rate. Last test (Sept 5, BR2026-02) showed rebuild to 18.1 barg in 36h. This confirms the anomaly is genuine and not just instrumentation drift. Provides critical data for hypothesis testing.

Integrity Constraints & Decision:

MAINTAIN SURVEILLANCE Monthly bleed/rebuild is required while source is unresolved. Next test due early October. If next rebuild exceeds 25 barg/24h, triggers immediate escalation to Action level.

Source: bleed_rebuild_tests SURVEILLANCE_PLAN

Scenario: Resolve Conflicting Instruments (DQ02)

Effect on Evidence & Uncertainty:

Local gauge reads 31.0 barg, transmitter reads 27.1 barg. Disagreement of ~4 barg. Neither is automatically preferred. If local gauge is correct, B-annulus is closer to Warning/Action thresholds. Resolving this reduces uncertainty and improves decision confidence.

Integrity Constraints & Decision:

REQUIRES ACTION Offshore Operations must verify local gauge calibration and transmitter loop. Until resolved, must assume worst-case (higher pressure) for safety. Does not lift production restriction.

Source: DQ02 E010 SURVEILLANCE_PLAN

Scenario: Complete Overdue Surveillance (Fingerprint)

Effect on Evidence & Uncertainty:

Fingerprint sample will determine if B-annulus gas is lift gas (supports FM-01) or produced fluid (supports FM-02/03). This is the single most critical piece of missing evidence to narrow down the failure mechanism.

Integrity Constraints & Decision:

CRITICAL ACTION Sample is overdue since 01 Sept (DQ06). Must be obtained immediately. Until analyzed, source attribution remains unresolved, and production increase cannot be justified.

Source: DQ06 E013 WELL_FAILURE_MODEL

Scenario: SCSSV Fails Acceptance Test

Effect on Evidence & Uncertainty:

Current leak rate is 0.44 L/min (limit 0.50). If it fails, the primary subsurface isolation barrier is compromised. This would trigger immediate escalation per IR-P17-2026-04 ("new evidence of a second degraded barrier element").

Integrity Constraints & Decision:

ESCALATE & RESTRICT Would require immediate well shut-in or intensive intervention planning. Production restriction would become absolute. Triggers formal well integrity review.

Source: valve_test_history IR-P17-2026-04 FM-08
CONTEXT
VALIDATE
DETECT
COMPARE
INTERPRET
HYPOTHESISE
ASSESS
DECIDE
ACT

Operational Disposition & Recommendation

RECOMMENDATION: MAINTAIN RESTRICTION. DO NOT APPROVE PRODUCTION INCREASE.

The well remains inside absolute pressure limits (MAASP), but the B-annulus anomaly is unresolved, surveillance is overdue, and data quality conflicts exist. Production Engineering's request for +10% choke (E014) cannot be approved until integrity constraints are satisfied. A production opportunity does not override unresolved integrity constraints.

Barrier & Integrity Implication

  • Primary Containment: SCSSV and tree valves are functional but SCSSV shows degradation trend. Tubing and packer integrity not disproved but unconfirmed.
  • Secondary Containment: B-annulus sustained pressure indicates loss of secondary containment margin. Source (lift gas vs produced fluid) unknown.
  • Cumulative Concern: Deteriorating SCSSV trend + unresolved B-annulus source + overdue surveillance = reduced overall well integrity confidence.

Required Actions & Diagnostics

PriorityActionOwnerTrigger/Deadline
CriticalObtain and analyze B-annulus fingerprint sampleWell Integrity EngineerOverdue since 01 Sept
HighResolve B-annulus gauge vs transmitter disagreementOffshore OperationsWithin 7 days
HighPerform monthly B-annulus bleed/rebuild testWell Integrity EngineerEarly October 2026
MediumReview SCSSV maintenance/replacement planWells/OperationsBefore next 6-monthly test

Escalation Triggers

The following conditions require immediate escalation and production restriction:

  • B-annulus pressure ≥ 40 barg OR rebuild > 25 barg in 24h.
  • C-annulus pressure > 3 barg sustained or correlated rise with B.
  • Fingerprint sample confirms produced fluid (indicates casing/tubing leak).
  • SCSSV fails acceptance test (leak > 0.50 L/min).
  • New evidence of a second degraded barrier element.
  • Unexplained data quality issues preventing safe operation assessment.
Source: IR-P17-2026-04 OPERATING_LIMITS_AND_MAASP

Conditions to Change Decision

The restriction on production increase may be lifted only if:

  1. Fingerprint sample confirms gas is lift gas (supports FM-01) AND rebuild rate is stable/understood.
  2. Instrument disagreement is resolved and confirmed B-annulus is safely below Warning thresholds.
  3. SCSSV leak trend stabilizes or valve is replaced.
  4. Formal Well Integrity Engineer approval is granted based on updated risk assessment.

Note: Even if B-annulus is below MAASP, this does not prove acceptable integrity. Trend, source, rebuild, barrier status, and surveillance completeness remain relevant.

Source: OPERATING_LIMITS_AND_MAASP INTERPRETATION_RULE